 Incompleted Projects 
1- Zirdan R.C.C Reservior Dam which is 150 km far from Chabahar in Baluchestan province, is the third Roller Compacted Concrete dam in Iran. It is 64.5m high and has a 350m long crest. The main quantities of this project are: 300,000m3 roller compacted concrete, 200,000m3 conventional concrete casting and approximately 1,200,000m3 excavation in rock and soil. The reservoir capacity is 200,000,000m3. Start date: 2002
 
2- Marvak Reservior Dam is a Rockfill dam with clay core,  is 45km far from Boroujerd in Lorestan province. It is 67.5m high and has a 451m long crest. The main quantities of this project are: 3,655,000m3 embankment and approximately 1,600,000m3 excavation in rock and soil. It has a free ogee spillway and the reservoir capacity is 100,000,000m3. Start date: 2003
 
3- Absardeh Reservior Dam  is a Rockfill one-arch dam with clay core, located in 16km southwest of Borojerd, Lorestan province, Iran. The height of dam is 84 m, and the crest length is 450 m. The total volume of embankment is 2,700,000m3 and excavation is 400,000 m3. It has a free Ogee spillway and two diversion    tunnels. Start date: 2010
 
4- Gavi Reservior Dam is a Rockfill dam with clay core,  is 25km far from Mehran in Ilam province. It is 102m high and has a 800m long crest. The main quantities of this project are: 9,000,000m3 embankment and approximately 4,800,000m3 excavation in rock and soil. It has a free ogee spillway. Start date: 2010
 
5- Taleghan- Hashtgerd Road Tunnel in South of Taleghan with  965m length and 70m2 cross section area,i/c excavation, and lining and installations.Start date: 2009
 
6- Construction of X1 metro station of Tehran metro line 1, in Ghods sq. by NATM method (underground), width=19m, height=21m, length=240m. The main quantities of this project are: 160,000m3 underground excavation, 55,000m3 concrete casting and 8,500ton of steel reinforcement. Start date: 2008
 
7- Mid-Tunnel air ducts W1X1, V1W1, U1V1 of north extention of Tehran metro line 1
 
8- Construction of Defae Moghaddas(soffeh) metro station in Isfehan. The main quantities of this project are: 12,000m2 total area, 230,000m3 earthwork (excavation and earth fill), 43,000m3 concrete casting, 5000ton of  steel reinforcement and 49,000m2 formwork. Start date: 2006
 
9- Construction of Daneshgah metro station in Isfahan, in Hezar Jarib Street,  The main quantities of this project are: 14,000m2 total area, with 38,000m3 earthwork, 29,000m3 concrete casting and 2,300 tons of steel Reinforcement. Start date: 2009
 
10- Construction of Football Stadium and swimming Pool of khozestan steel Co. Club, in Ahvaz, with appro  area of 30,000m2 ; i/c 30,000m3 concrete works, 2,200tons of rebar fabrication and 2,000 tons of heavy steel structures. Start date: 2008

 